Title 5 sits early in the timeline, not at the end
Where a property is on a private septic system, Massachusetts requires a Title 5 inspection in connection with most transfers, and a failed system becomes a negotiation and a schedule problem at once. It is sequenced at the start of a file here, because the result changes the offer rather than confirming it.